Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM05079

Parcel: 137070500

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Permit Number - T03CM05079

Inspection Description - PLUMBING - GAS PRESSURE TEST

Inspection Status - Approved

Date Description Inspector Results Comments
12/07/2011 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
06/12/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1. NEED TO HAVE PETITION OF APPEAL ON SITE.
2. NO PRESSURE TEST ON GAS PIPING.
03/06/2006 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
7:55 PROVIDE ACCESS AT TIME OF REINSPECTION
POST YOUR ADDRESS
01/05/2006 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
1) PIPING AND PRESSURE TEST-OK
2) OK TO COVER PIPING
3) CONNECT STOVE OR CAP VALVE
4) PROVIDE PETITION OF APPEAL FOR T & P TERMINATION-LEAVE COPY ON SITE
5) PETITION OF APPEAL REQUIRES THAT THE T & P AT THE WH TERMINATE 1" ABOVE FLOOD LEVEL AND RELIEF VALVE AT EXTERIOR TERMINATE 6" ABOVE GRADE
6) RECALL FOR INSPECTION
09/29/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) 10 PSI TEST MINIMUM AT TIME OF INSPECTION SHALL HOLD FOR 15 MINUTES WITH NO PRESSURE LOSS. SEE NOTES #5
2) VENTS FROM WATER HEATER AND FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE FOR WATER HEATER, 2' ABOVE FOR FURANCE TOP OF COOLER INTAKE
3) PROVIDE BONDING OF BLDG GAS PIPING
4) PROVIDE 3-GALV SCREWS AT EACH JOINT OF GAS APPLIANCE VENT PIPING
5) PROVIDE 100 SQUAR INCH UPPER AND COVER COMBUSTION AIR OPENING FOR WATER HEATER
6) PROVIDE PEITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF WITH CORRECT INSTALLATION ON SITE SIGNED BY CITY