Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - TEMPORARY SERVICE
Permit Number - T03CM05079
Inspection Description - ELECTRIC - TEMPORARY SERVICE
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2004 | ELECTRIC - TEMPORARY SERVICE | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* NOTES. INTERIOR WIRING IS TO UNSAFE TO ENERGIZE SERVICE, NO DEVICES INSTALLED YET. SERVICE CAN BE ENERGIZED AFTER TRIM OUT OF INTERIOR, SWITCHES, RECPTS, CAP OFF ANY EXPOSED WIRING OUTSIDE OF BOXES. |
|
05/28/2004 | ELECTRIC - TEMPORARY SERVICE | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ 1) NEW WORK NOT DONE PER CODE. 2) MUST USE LICENSED CONTR. LEAVE NAME AND NUMBER FOR VERIFICATION. 3) INDIVIDUAL FEEDERS TO NEW PANEL NOT IN RACEWAY. 4) LINE CONDUCTORS INTO SERVICE DISC. SWITCH TOO SHORT - DON'T REACH LUGS. 5) MUST HAVE GFI RECEPT OUTSIDE FOR TEMP POWER. 6) ROMEX WIRING INSIDE NOT STAPLED PER CODE. UNCOVER WALLS ALREADY DRYWALLED. |