Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2004 | ENGINEERING - FINAL | Approved | ||
| 06/04/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O ONLY. 1. PROVIDE SLOPE STABILIZATION ON WEST SIDE OF NEW ADDITION. 1:1 SLOPES = GROUTED ROCK RIP RAP, 2:1 SLOPES = ROCK RIP RAP OVER FILTER FABRIC. ( CANNOT USE CHAIN LINK FENCING AS A RETAINING WALL). 2. REMOVE ALL EXCESS SOIL EXCAVATED FROM THIS SITE ALONG THE WEST SIDE OF THE NEW AND EXISTING BUILDING, AND ALONG THE NORTH PERIMETER. 3. STABILIZE THE SLOPE AT THE RAIN LEADER OUTFALL TO THE EASEMENT ON THE NORTH. |
|
| 05/28/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. TAPER SLOPE TO MATCH EXISTING GRADE AT THE WEST SIDE OF THE NEW ADDITION. (CANNOT USE CHAINLINK FENCE AS A RETAINING WALL). 2. PROVIDE ROCK RIP RAP AT ROOF DRAIN OUTLETS ON WEST SIDE OF NEW BUILDING TO PREVENT EROSION OF SLOPE AND SOIL. 3. BACKFILL TRENCH FOR RAIN LEADER ON NORTH SIDE OF PROPERTY. |