Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/WATER TEST WASTE & VENT THRU ROOF FOR EXTERIOR DRINKING FOUNTAIN AT SOUTH WEST CORNER ADD 1/2" H2O SUPPLY FOR SAME TO PSI AIR TEST OK | |
10/20/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
10/07/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)HAVE ARCHITECH PROVIDE DETAIL DRAWINGS FOR EXTERIOR DRINKING FOUNTAIN P-6 PRIOR TO INSPECTION 2)FINAL CONNECTION TO BLDG SERVICE 3" IS OK |
|
10/06/2004 | PLUMBING - ROUGH, SOIL | Cancelled | IVRS - Ri canceled | |
08/10/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) PRE-SLAB AT AIR HANDLING ROOM 122 OK | |
07/27/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*PARTIAL APPROVAL. WATER TEST ON WASTE VENT FOR REROUTE OF 4" WASTE IN MENS SHOWER 113 AND WOMENS RESTROOM 114 BECAUSE OF FOOTINGS. OK. | |
06/21/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) WATER TEST ON 4" BW AND 4" BLDG DRAIN THRU BLDG TO 2-WAY CLEANOUT AND CAPPED JUST PRIOR TO BACKWATER VALVE AREA OK 2) 6" SITE SEWER FROM MANHOLE STA 0 + 00 TO STA 0 + 90 AND STA 1 + 55 INSTALLED PER PLAN 3) AIR TEST AT LATER DATE 4) THIS SEWER WILL REQUIRE VERIFICATION OF GRADE BY ENGINEER STAMPED 5) THIS SEWER MAY REQUIRE CERTIFICATE OF COMPLIANCE FROM ADEQ. 6) WILL NEED TO SEE HCS CONNECTIONS FOR BACKWATER VALVE AND 4" BLDG DRAIN 7) MAN HOLE WILL REQUIRE ? BUILD UP | |
06/15/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 3" BW FROM INITIALED AT SWOOP DOWN STREAM OF SHOWER WOMENS LOCKER 115 BACK UP STREAM TO 3-2" P-8'S OK. | |
06/08/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/07/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 4" BW AND 4" BLD DRAIN PER INITIALED DRAWING IN CONSTRUCTION TRAILER WTR TEST OK. 1) PLEASE VERIFY RIM ELEVATIONS OF MANHOLE UPSTREAM AS TO WHY ONLY 1 BLD DRAIN REQUIRES BACKWTR VALVE. |