| 08/12/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/11/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/1)TRENCH DRAIN WATER TEST OK 2) CALL IN FOR PRE SLAB PIPE WRAPST? FLOOR CLEANOUTS? | |
| 08/10/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) WATER TEST FOR INLET AND OUTLET OF SAND/OK INTERCEPTOR TO TIE IN TO SANITARY AND HCS CONNECTION OK 2) NEED TO SEE WATER TEST ON TRENCH DRAIN | |
| 08/05/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :4" WASTE AND VENT FOR SANITARY SYSTEM WATER TEST OK TRENCH DRAIN MUST HAVE WATER TEST CLEANOUT AT SAND/OIL SEPERATOR IS IN BACKWARDS WILL NEED TO SEE SAND/OIL SEPERATOR TEST WITH INLET & OUTLET PIPING IN PLACE BUILDING INTERIOR WATER TEST SAND/OIL SYSTEM OK OK FOR BACKFILL EXCEPT TRENCH DRAIN |