Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM04982
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/09/2005 | ENGINEERING - FINAL | Approved | ALL NECESSARY CORRECTIONS HAVE BEEN MADE. | |
08/12/2005 | ENGINEERING - FINAL | Denied | ITEMS # 4, 5, 6, AND 9 FROM INTERMEDIATE GRADING PUNCH LIST NEED TO BE COMPLETED. INSTALL BALLARDS AT MID-ACCESS FROM WILMOT. CLEAN UP OF ALL CONSTRUCTION DEBRIS. SUMMARY OF ITEMS: ITEM #4 PROVIDE 12" SINGLE CURB AS OPPOSED TO 6" ON EAST OF THE NORTHEAST ENTRANCE OR PROVIDE C.O.T. REVISED APPROVED PLANS INDICATING ACCEPTED CHANGE. #5 PROVIDE COMPLETED TRASH ENCLOSURE #6 COMPLETE LANDSCAPING ALONG THE NE CORNER OF THE SITE WITH 6" DEPRESSED LANDSCAPING. #9 PROVIDE POSITIVE DRAINAGE IN THE NW CORNER OF THE SE PARKING AREA. Per Dave Roberts- Replace damaged ballard on the Northern most entrance off of Wilmot. |