Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM04982
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* TURNED IN (10) BACKFLOW CERTIFICATIONS TURNED IN (1) BOILER REPORT. BUILDING INSPECTOR TO RECEIVE BACKFLOW CERTIFICATION FOR TEA BREWER IN CAFE. |
|
10/14/2005 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :NEED (1) BACKFLOW CERTIFICATION FOR DEVICE AT CAFE FOR TEA BREWER ONLY AND ALL OTHER BACKFLOW CERTIFICATION WITH STATE BOILER APPROVAL TO COMPLETE JOB* | |
09/09/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEE NOTES FROM PAST INSPECTIONS |
|
08/26/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BOILER VENTING OK 2) GAS CARD AT METER 3) PROVIDE STATE BOILER INSPECTION AND ITEMS FROM PAST INSPECTIONS |
|
08/11/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
08/10/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
07/29/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO SEE HEARTH ? PLAN OF IKE'S CAFE 2) 2-COMP SINK SHOWN GOING DIRECT WASTE-3COMP INSTALLED GOING INDIRECT. PLEASE SEE NOTES FROM 7/11/05 AND 7/15/05 AND COMPLY. NEED REVISION FOR JANITOR ROOM 125 REVISED PLAN SHOWS MOP SINK, FLOOR SINK, AND FLOOR DRAIN ONLY MOP SINK AND FLOOR SINK INSTALLED. NEED INSTALL OF EYE WASH SHOWER IN CENTRAL PALN ENCLOSURE. NEED PROOF OF STATE BOILER INSPECTION |
|
07/28/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTES FROM 7/11/05 INSPECTION ALL INDIRECT DRAINS TO BE FULL SIZE RIGID PIPING OVER 5" TRAPPED OVER 15' P-TRAPPED & VENTED WITH CLEANOUTS IF REQUIRED. PREVIOUS SIGNAGE FOR HOSE BIB AT EFFECTS FOUNTAIN FILTER EQUIPMENT PER 94 UPC SECTION 603.3.11 DANGER UNSAFE WATER AND VACUUM BREAKER |
|
07/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE ALL PLUMBING WORK THEN CALL INSPECTIONS. | |
07/11/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CALL IN ALL INSPECTIONS THAT HAVE NOT BEEN APPROVED AND HAVE RED LINES & REVISED CITY APPROVED PLANS ON SITE. 2) PROVIDE ACCESS TO COOLERS TO VIEW H20 AIR GAP. 3) INSTALL HOSE BIBS WITH VACUUM BREAKERS. 4) SEAL ALL PIPE PENETRATIONS INTO BUILDING. 5) PROVIDE CERTIFICATIONS FOR ALL BACKFLOW DEVICES. 6) ALL FLOOR CLEANOUTS TO BE FLUSH TO FINISH FLOOR. 7) VENTS THRU ROOF REQUIRE FLASHING AND SHALL BE MINIMUM 1' FROM BUILDING SIDE WALL 8) ICE MACHINES REQUIRE PROOF OF 1" AIR GAP FOR H2O SUPPLY OR CORRECT BACKFLOW PROTECTION, AND SEPARATE INDIRECT DRAINS. 9) EXPOSE ALL CLEANOUTS AT SINKS &PROVIDE CLEANOUT COVERS. 10) CHECK YOUR WATER HEATER PIPING DETAIL & SUPPORT EXPANSIOPN TANK. 11) COFFE MAKERS WILL REQUIRE SEPARATE BACKFLOW PROTECTION. 12) STOLL REQURE MINIMUM 15" SIDE WALL OBSTRUCTION CLEARANCE. HAVE ALL FIXTURES FUNCTIONAL . THIS IS NOT A COMPLETE LIST |