Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2005 | ENGINEERING - FINAL | Approved | ||
| 04/08/2005 | ENGINEERING - FINAL | Partial Approval | Temp C of O approved for building 3, still need to complete item #1,2,5 from previous punch list prior to final C of O | |
| 04/07/2005 | ENGINEERING - FINAL | Denied | DENIED, ITEM #5 FROM PREVIOUS INSPECTION DATED 4/6/05 HAS NOT BEEN COMPLETED. ALSO, ENSURE AN UNRESTRICTED PEDESTRIAN ACCESS AND WALKWAY AROUND BUILDING #3 HAS BEEN ESTABLISHED. |
|
| 04/06/2005 | ENGINEERING - FINAL | Denied | Complete the following prior to final C of O 1. Clean catch basin at the NE corner of the parking lot in front of building 3 2. Finish the covered parking areas. 3. Finish the bike parking area. 4. re-establish the drainage swale at the SE corner of Shannon and Broadway. 5. Remove all construction debris from parking area and around building 3. Note a temporary C of O can be granted if all items except #2 are complete. Item #2 must be complete prior to final C of O. |