Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM04894
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) PLUMBING FINAL OK. 30 OK FOR C OF O PENDING ANY OTHER INSPECTION | |
| 02/03/2005 | PLUMBING - FINAL | Not ready for Inspection | 1) SEE NOTE #3 FROM 1/28/05 AND NOTE #2 FROM 2/01/05 | |
| 02/01/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY. 2) I WILL ACCEPT PLUMBERS TYPE AT EXPANSION TANK, ONLY IF THE WEIGHT OF THE TANK IS SUPPORTED. 3) INTERMINGLING ABS AND PVC SOLVENT WELD IS NOT PERMITTED | |
| 01/28/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE PVC TRAP ADAPTER FOR PVC PIPING AT KITCHEN DRAIN. 2) PROVIDE BACK FLOW CERTIFICATION. 3) SECURE EXPANSION TANKS TO PREVENT STRAIN ON CPVC PIPING. 4) RECT?? PIPE DOPE IS NOT APPROVED FOR USE ON ABS PIPING & FITTINGS | |
| 01/27/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NOT READY | |
| 01/24/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) EXPANSION TANKS MUST BE SUPPORTED MAY NOT HANG FROM CPVC | |
| 01/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MUNICIPAL WATER SUPPLY PROTECTED BY BACKFLOW DEVICE-MAKING APTS A CLOSED SYSTEM. ALL WATER HEATERS WILL REQUIRE EXPANSION TANKS | |
| 01/14/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/1)IN THE FIRST UNIT I FOUND 1)A KINKED CONDENSATE DRAIN 2)BOTTOM EDGE OF TUB NOT CAULKED 3)NO NOTICE IN ELECTRIC SERVICE PANEL 2)HAVE PLUMBER COMPLETE PUNCH LIST BEFORE CALLING FINAL | |
| 01/12/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE ALL CONNECTIONS 2) HOOK UP ALL APPLIANCES 3) HAVE ALL AREAS ACCESSIBLE FOR INSPECTION |
|
| 01/11/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*NOT READY |