Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T03CM04885
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection : See detailed listing on site.| 999*/ 1) AIR PRESSURE TEST ON WASTE AND VENT SYSTEM IS OK 2) MUST SEE FINAL CONNECTIONS TO SUMP PUMP AND HOLDING TANK 3) OK FOR BACKFILL AND CONCRETE |
|
04/26/2004 | PLUMBING - ROUGH, SOIL | Denied | 1) MUST PROVIDE DWV PVC SCHEDULE 40 MATERIAL FOR DRAINAGE MATERIAL AND FITTINGS 2) MUST PROVIDE AIR TEST MINIMUM 5 POUNDS AT TIME OF INSPECTION 3) MUST SEAL PENETRATION THRU WALL | |
04/22/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1) NO TEST 2) PROVIDE PROPER TRANSITION FITTINGS INSIDE BLDG FROM PVC-ABS. ALSO PROVIDE APPROVED TRANSITION FITTING BETWEEN PVC AND ABS AT TANK 3) VENT NOT TO CODE |