Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2004 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 05/26/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NEED 10" TREAD MINIMUM 2) PLAN FOR LEDGER ATTACHMENT |
|
| 02/03/2004 | BUILDING - FINAL | Denied | IVRS - Inspection 0999*/ 1) STAIRS DO NOT MEET CODES, RISE, RUN AND HANDRAILS 2) BOLT ATTACHMENT OF STAIR TO DECK-TOP SUPPORT-IS INADEQUATE 3) INSTALL LAG BOLTS PER PLAN AT LEDGER, POST BRACING AND STAIRS 4) POST SPACING EXCEEDS PLAN 5) POST BASES DO NOT MATCH PLAN 6) BLOCK ROOF SHEATHING LESS THAN 2' IN WIDTH 7) SHOW STRINGER SIZE ON PLAN 8) NOTES: IDICATE LIGHTING ADDITION/FAN. DIG OUT ONE POST FOOTING AND ONE STAIR FOOTING |