Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2008 | ENGINEERING - FINAL | Approved | PRIOR TO FINAL APPROVAL FOR COMPLETION OF ENTIRE DEVELOPMENT (PHASE I, SEPT. 03 APPROVED SITE PLAN) 1) INSTALL HC ACCESS RAMPS AND SIDEWALK (SEE NOTES 25, 15, AND 13). 2) PROVIDE BOLLARDS IN TRASH ENCLOSURES PER NOTE #12 ON APPROVED PLAN AND COT DEV STD 6-01. |
|
| 12/28/2007 | ENGINEERING - FINAL | Partial Approval | Items 1,2, and 4 complete, need to finish conc. c/w south of building and sweep parking lot, remove const. dumpster. | |
| 12/17/2007 | ENGINEERING - FINAL | Denied | 1) INSTALL TRUNCATED DOMES AT ALL HC RAMPS. 2) COMPLETE HC RAMP ALONG SOUTH SIDE OF BLDG. 3) COMPLETE ALL SITE WORK, TO INCLUDE OVER HEAD WORK ON BLDG. 4) INSTALL BOLLARDS IN TRASH ENCLOSURE. |