Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/ 1) TWO WAY CLEAN OUTS INSTALLED ON BRANCHES. 2) OK TO BACKFILL. | |
| 06/08/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) ABS REQUIRES AT LEAST 12" OF COVER - SEE PLBG NOTES - MATERIAL FOR WASTE PIPING. 2) BRANCHES MORE THAN 5 FT FROM MAIN TO HAVE FULL SIZE CLEAN OUTS. |