Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM04561
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2006 | ENGINEERING - FINAL | Approved | PER INSP CARD | |
| 07/14/2006 | ENGINEERING - FINAL | Denied | SEE NOTES FROM FINAL GRADING INSPECTION FOR PERMIT# T03BU01928 | |
| 06/29/2006 | ENGINEERING - FINAL | Denied | Final C of O denied, items 1,3,4,5,6 from 8/25/05 inspection complete. Finish items 1 & 7 prior to final approval. Also must get drainage certified by PE prior to final. | |
| 08/30/2005 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O FOR BUILDING 1 | |
| 08/25/2005 | ENGINEERING - FINAL | Denied | DENIED, 1) REMOVE AND/OR BARRICADE TEMP POWER PEDESTAL ON EAST SIDE OF BLDG. 2) CLEAN UP CONSTRUCTION DEBRIS, MATERIAL, AND EQUIPMENT. 3) H.C. RAMP NOT INSTALLED PER PLAN ALONG NORTH SIDE BLDG #1. 4) NO BICYCLE PARKING INSTALLED. 5) PARKING LOT STRIPING NOT COMPLETED PER PLAN. 6) UNABLE TO PROVIDE A SAFE ENVIRONMENT FOR OCCUPANTS OF BLDG DUE TO CONSTRUCTION ACTIVITY ON SITE, ( HEAVY EQUIPMENT, OVERHEAD WORK, INCOMPLETE AND UNOBSTRUCTED PEDESTRIAN PATHWAYS). 7) SITE WORK NOT COMPLETED. |