Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM04450

Parcel: 10818716A

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T03CM04450

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/15/2004 PLUMBING - FINAL Approved IVRS - Inspection 0000*/ 1) PLUMBING CORRECTIONS MADE OK. RPZ CERTS ON FILE WITH TUCSON WATER. 2) PLUMBING FINAL OK. 3) OK FOR C OF O PENDING ANY OTHER INSPECTIONS.
01/14/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ OK FOR TEMP POWER. CONTRACTOR PRODUCED TEMP POWER FOR TESTING - AND SUBSTITUTED GAS INSTEAD. DON'T WE HAVE THE PROPER FORM? OK FOR GAS SUBJECT TO MECH. INSPECTOR AND STEVE LONG
01/12/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) I DEVICE PER I BACKFLOW DEVICE. 2) DRAINAGE FITTINGS TO BE USED ON ALL DRAINS. 3) CLEAN OUTS AT 135o CHANGE OF DIRECTION ON DRAINS. 4) P-TRAP ON INDIRECT DRAIN OVER 5' IN LENGTH. 5) SECURE T&P DRAIN LINES. 6) ALL GAS APPLIANCES TO BE INSTALLED OR CAP GAS PIPING. 7) WTR SEAL ALL FIXTURES. 8) ALL DRAINS TO BE SECURED AND HAVE 1" MIN. AIR GAP AT FLOOR SINKS.