Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T03CM04419
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/ 1) GAS PRESSURE TEST IS OK 2) CLOSET RING INTSTALLATION IS OK 3) H.B. AT EAST WALL OK | |
07/14/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) POST YOUR ADDRESS 2) ADD 03050 TO PERMIT FOR GAS PRESSURE TEST AND CALL FOR INSPECTION 3) CLOSET FLANGE-PIPE TO BE EVEN WITH TOP OF FLANGE 4) CAULK INSIDE AND OUTSIDE WITH CAULKING IRONS 4) OK TO COVER ALL AREAS | |
07/13/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
07/12/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) WATER TEST WASTE AND VENT AT MOP SINK OK THRU ROOF H20 AT MOP SINK OK 2) PROVIDE WATER TEST THRU ROOF AT RESTROOM FOR WASTE AND VENT 3) 03050 14 PSI AIR TEST ON NEW 3/4" TO ROOF TOP UNIT PARTIAL APPROVAL PENDING SEEING NEW AGA OR CSA APPROVED GAS VALVES AT FURNACE, VENTS FROM FURNACES TO BE RAW UPHILL TO POINT OF TERMINATION AND PROVIDE PROPER BONDING OF GAS PIPING 3) NEED TO SEE RETEST AT TIME OF VALVE INSTALLATION AT ROOF TOP UNIT AND FURNACE 4) PROVIDE ROOF CASHINGS FOR VENTS AND INSTALL CLOSET FLANGE PRIOR TO SETTING OF STOOL | |
07/09/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST SECURE HOT AND COLD WATER DROPS AT MOP SINK AREA 2) AIR TEST ON GAS SYSTEM DOWN 0 POUNDS 3) MUST SECURE LOOSE COPPER AT MOP SINK AS REQUESTED |
|
07/06/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*/ 1) NOT READY FOR INSPECTION |