Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2004 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK 2) OVERHEAD WATER DISTRIBUTION IS OK 3) OK OT DRYWALL |
| 03/15/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) SEE PLBG PLAN NOTE #6 ON SHEET 5. 2) CHANGES OF DIRECTION SHALL BE MADE BY THE USE OF APPROVED FITTINGS, NOT BENDING, AS NOTED IN NOTE #6 - ABOVE GRADE TO BE HARD DRAWN. 3) SECURE CLOSET FLANGES. 4) NO TEST ON ABS. 5) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 6) GAS PRESSURE TEST OK. |