Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
Permit Number - T03CM04130
Inspection Description - ELECTRIC - UNDERGROUND
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/12/2004 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
09/27/2004 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
09/20/2004 | ELECTRIC - UNDERGROUND | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)CONFIRMED WITH McGETREY'S OFFICE (KEN RIDGELIY) ON REQUIREMENT THAT ALL RECEPTACLES IN PATIENT CARE AREAS WHICH INCLUDE CHAIR AND WALL RECIPTACLES NEED TO BE IN METAL RACE WAYS PER SECTION 513-13 A OF THE 99 MEL. 2)THIS NOTE HAS BEEN PUT ON PLANS AS A DELTA 1 ON SHEET E-Z 3)THE CONDUITS COMING FROM UNDERGROUND TO FEED RECEPACLES ARE IN PVC-ABOVE GROUND HCF MC OKEY |
|
04/26/2004 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection : The service is not per code.| 210*/ PRE-SLAB - PVC - OK. |
|
04/23/2004 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :*/ 1) STUB UPS AT LOAD CENTER | |
04/21/2004 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection 0000*/ 1) PRE-SLAB PVC, OK |