Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ CORRECTION MADE - 2 BACKFLOW CERTIFICATIONS TURNED IN. |
| 04/19/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 15 PSI TEST ENTIRE SYSTEM, CORRECTION MADE ON ROOF TOP FOR FLEXES OK. CORRECTION MADE TO WTR HTR PIPING OK. NEED BACKFLOW CERTIFICATIONS FOR FINAL. GAS CARD AT METER PER BOND POSTED. |
| 04/14/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) INSTALL WTR HTR TO APPROVED PLAN - PIPING. 2) BACKFLOW PROTECTION - TESTABLE DEVISE - WILL BE REQUIRED FOR LANDSCAPING WTR SUPPLY. 3) WILL NEED CERTIFICATION OF BACKFLOW DEVICES FOR FINAL. 4) PROVIDE PROPER SUPPORT AND CLAMPS AT BOTH GAS SUPPLIES TO ROOF TOP UNITS. 5) PROVIDE RATED FLEX OR RIDGID PIPE ROOF TOP UNITS. |