Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2004 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* | |
| 08/10/2004 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) UPSTREAM MANHOLE APPEARS TO BE ABOVE 12" BELOW FINISHED FLOOR ELEVATION. PROVIDE MANHOLE ELEVATION AND FINISHED FLOOR ELEVATION. YOU MAY NEED A BACKWATER VALVE AT CLEANOUTS. OK TO COVER. HOUSE DRAIN AND SEWER LINE TO WITHIN 4' OF CLEANOUTS EITHER SIDE. DO NOT BACKFILL CLEANOUT AREAS 2) YOU MUST REMOVE ORGANIC MATERIAL TREE STUMP FROM UNDER HOUSE 3) NOTE: THIS HOUSE IS BUILT ON FILL MATERIAL. YOU MUST PROVIDE ENGINEERS SOIL COMPACTION. TEST PRIOR TO SLAB APPROVAL |