Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T03CM03910
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/06/2004 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
06/28/2004 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245*/ SUPPORT EMT CONDUIT WITHIN 3' EACH TERMINATION AND AT 10' INTERVALS. CONDUIT TO BE SUPPORTED TO BLD STRUCTURE - DO NOT SUPPORT CONDUIT TO CONDUIT PER NEC. OPEN CEILING TILES FOR ABOVE CEILING CONDUIT INSP. |