Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM03885

Parcel: 132130580


Addresses:

1111 E BENSON HY

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
12/15/2004 PLUMBING - FINAL Approved IVRS - Inspection :*/(3) BACKFLOW CERIFICATIONS TURNED IN
12/08/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/CORRECTIONS MADE, REVISED & REDLINE & CITY APPROVED DRAWINGS ON SITE. 1)PROVIDE BACKFLOW CERTIFICATION FOR LANDSCAPING BACKFLOW PROTECTION FOR DEGREASER ON WALL IN WASH BAY. 3)PROVIED BACKFLOW CERTIFICATION FOR H2O MAIN SUPPLY TO BLDG. AND BACKFLOW CERTIFICATION FOR IN HOUSE PRESSURE WASHER WITH CHEMICAL ADDITION
11/15/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/CALL IN ALL INSPECTIONS THAT HAVE NOT BEEN APPROVED 1)PROVIDE VACUUM BREAKER ON ACC HOSE BIBS 2)PROVIDE CLEAN OUT PLUG & COVER AT WASHING MACHINE 3)PROVIDE CORRECT BACKFLOW PROTECTION FOR CHEMICAL ADDITION. PRESSURE WASHER WITH CERTIFICATION 4)SEE NOTES FROM 5/20/04 INSPECTION 5)HAVE RED LINES ON JOB 6)HAVE ALL BACK FLOW CERTIFICATIONS. (COPIES FOR TURN IN)
07/19/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*/ 1) NO PROBLEM FOR TEMP C OF O 2) NEED ALL CORRECTIONS LISTED ON THESE SHEETS FOR FINAL AND COMPLETION OF ALL WORK 3) DRYER VENT TO TERMINATE TO DAYLIGHT
07/14/2004 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*