Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T03CM03878
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/ 1) WATER TEST ON POOL AREA DRAIN IN DECK AROUND POOL OK | |
07/06/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ 1) 30 PSI AIR TEST FROM METER LOCATION TO OVERHEAD IN POOL EQUIPMENT ROOM 2 1/2" PER PLAN | |
07/01/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ PIPING MUST HAVE MIN. 1/8" PER FOOT FALL CORRECT DRAINAGE FITTINGS SHALL BE USED. 10' HEAD ON WTR TEST SHALL BE IN PLACE. | |
06/29/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/28/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/25/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE APPROVED DRAINAGE FITTINGS AT ALL LOCATIONS. 2) PROVIDE UPPER TERMINAL FULL SIZE CLEAN OUTS ON ALL RUNS. 3) ALL PIPING TO BE RUN AT ΒΌ" PER FOOT FALL. 4) PIPING AT DRINKING FOUNTAIN CROSSING TO NOT INTERFERE WITH DRAINAGE. | |
06/24/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/23/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ ADDITION OF FLOOR C.O. IN POOL EQUIP. ROOM WTR TEST ON POOL EQUIP. DRAINAGE OK. | |
06/21/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
06/02/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
02/12/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 4" POOL EQUIPMENT BLD DRAIN 5' OUTSIDE BLD WEST, 2-4X3 COMBO STUBS FOR POOL AREA DRAINS, WEST TO 2-4" FLOOR SINKS, 1-3" FLOOR SINK. WATER TEST APPROVED. | |
01/30/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ WTR TEST ON REMAINDER OF UNDERGROUND WASTE AND VENT APPROVED ON SANITARY DRAINAGE. WILL NEED TO SEE ALL UNDERGROUND RAIN DRAINAGE AND POOL DRAINAGE. | |
01/21/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 1) WATER TEST ON 4" BLDG DRAIN FROM POINT OF TIE-IN TO 6" AT 5.3 + 6 NORTH TO GIRLS RESTROOM 146 AND 2" TO EDF-1 AT 2.7 + C | |
01/20/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* |