Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/24/2003 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 10/14/2003 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0245*/ PLEASE DO THE FOLLOWING: 1) CALL FOR ABOVE CEILING INSPECTION. HAVE CEILING TILES REMOVED FROM FRONT AND REAR OF EVERY LIGHTING FIXTURE INSTALLED OR RELOCATED IN CEILING SO I MAY CHECK FOR SEISMIC WIRES AND GRID FASTENERS 2) HAVE PANEL COVER REMOVED SO I MAY INSPECT INTERIOR WIRING AND CONDUIT TERMINATION 3) HAVE CONTRACTOR/ELECTRICIAN ON SITE TO SHOW ME WHERE MAIN POWER SOURCE IS LOCATED AND CONNECTION/TERMINATION OF FEEDER CABLES 4) YOU MAY BE REQUIRED TO POST A FUEL AND POWER TESTING BOND. CHECK WITH OUR MAIN OFFICE. ASK FOR STEVE LONG (FOR BEST INFO SOURCE) |