Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T03CM03824
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2003 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection 0000* | |
10/20/2003 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* | |
09/30/2003 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999*/ 1) INSTALL ELECTRIC FOR LIGHT IN PARLOR 2) INSTALL OUTLET LIVING ROOM PER PLAN 3) REMOVE ALL UNUSED WIRING, BOXES, ETC... 4) SECURE ALL ELECTRIC UNDER FLOOR TO JOINTS 5) MAKE ALL AND ANY J-BOXES ACCESSIBLE 6) WILL NEED ACCESS HOLES CUT THROUGH FLOOR TO VERIFY UNDER FLOOR ELECTRIC 7) UNCOVER ELECTRIC UNDERGROUND FROM MAIN TO SUB-PANEL 8) STOPPED INSPECTION | |
09/19/2003 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection 0999*/ 1) GROUND ALL M ETAL ELECTRIC BOXES 2) MECH DOES NOT MATCH PLAN 3) SECURE WASHER BOX TO WALL 4) WATER TEST SUPPLY LINES AND DWV 5) NEED GROUNDING BONDING AT PANEL AND VERIFY CONDUIT FROM MAIN 6) ELIMINATE ALL UNUSED ELECTRIC WIRES, OR TERMINATE IN BOXES 7) RUN PLUMBING TOP OUT THROUGH ROOF 8) PLAN CALLS FOR ADDITIONAL OUTLETS KITCHEN 9) PRESSURIZE GAS LINE 10 POUND MINIMUM TEST (COMPLETE ALL PIPING) 10) ATTIC A/C OVERFLOW DRAIN PLAN TO HAVE SLOPE TO ONE END AND TERMINATE ALTERNATE DRAIN TO AN ACCESSIBLE LOCATION 11) MUST HAVE GAS SCHEMATIC WITH WARD FLEX GAS LINE DRAIN ON PLAN 12) INSURE ADEQUATE COMB/RELIEF VENTS ATTIC FURNACE 13) STRAP ALL PENETRATIONS THROUGH FRAMING 14) NEED VERIFICATION OF ALL UNDER FLOOR FRAMING, FOUNDATIONS, ELECTRIC GAS PLUMBING 15) TOO SMALL OF AN AREA TO INSPECT 16) STOPPED INSPECTION |