Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2003 | ENGINEERING - FINAL | Approved | C OF O APPROVED. | |
| 10/07/2003 | ENGINEERING - FINAL | Prior to 1010/1015 | TEMPORARY C OF O APPROVED AT THIS TIME FINAL NOT TO BE GIVEN UNTIL THE FOLLOWING ITEMS HAVE BEEN COMPLETED AND RE-INSPECTED: 1) COMPLETE THE TRENCH BACKFILL AND AC PLACEMENT WITHIN THE SOUTHERN PARKING LOT. 2) COMPLETE ALL STRIPING AS SHOWN ON THE APPROVED PLANS, AND PROVIDE ALL HANDICAP PARKING AS SHOWN. 3) COMPLETE ALL SIDEWALKS AS SHOWN ON THE APPROVED PLANS OR PROVIDE AN APPROVED PLAN WITH ZONING AND ENGINEERING SIGNATURES NOTING ALL CHANGES MADE TO THE PEDESTRIAN ACCESS AREAS. |