Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/21/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 11/18/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) MUST REPLACE IMPORPERLY INSTALLED HOLDOWNS WITH EXPOXIED BOLTS CONCRETE ENCASEMENT NOT MAINTAINED 2) INSTALL BANG PLATES ALL PLUMBING ELECTRIC PENETRATIONS 3) NO WATER TEST, NO DWV TEST 4) RENAIL LATH AND CAULK ALL UN-NECCESSARY STAPLES EXPOSED INTERIOR 5) INSTALL WATER HEATER PTR LINE 6) MINIMUM 10 POUND GAS TEST REQUIRED 7) ELECTRIC STUBBED FOR ROOF TOP HEAT PUMP 8) STOPPED INSPECTION 9) CORRECT ALL 10) COMPLETE ALL |