Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 10/27/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0935*/ 1) STUCCO ABOVE REAR PATIO NOT COMPLETED 2) NOTHING DONE FROM LAST INSPECTION |
| 10/24/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) SEE #1 AND #2 PREVIOUS INSPECTION 2) WILL RE-FEE NEXT FAILURE |
| 10/23/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999* |
| 10/22/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) NOT READY AS PER SUPER |
| 10/21/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) SEE PREVIOUS INSPECTION 2) REFEE IMPOSED, PAY PRIOR TO NEXT INSPECTION |
| 10/20/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE 2 X 6 OR ALTERNATE FIX AT PLUMBING WALL IN LANDING 3" VENT 2) SECURE PLUMBING WASTE LINES 3) POWDER ROOM INCOMPLETE 4) MECH INCOMPLETE |
| 10/16/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0999*/ 1) NO TEST ON DWV'S 2) EXHAUST FAN IN LAUNDRY ROOM NOT CONNECTED 3) NAIL PROTECT WATER LINES WITHIN 1 1/2" FROM EDGE OF STUD 4) STOPPED INSPECTION IN KITCHEN. RECALL WHEN READY 5) LATH INSTALLATION NOT COMPLETED |