Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T03CM03525
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/01/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000*/ 1) CONTRACTOR TO SUPPORT OVERHEAD HORIZONTAL ABS AS REQUIRED. 2) CORRECTIONS MADE OK. 3) OK TO COVER ALL AREAS. | |
03/31/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*/PLEASE READ AND COMPLY WITH ALL CORRECTIONS. SEE NOTE#3 FROM 3/26/04 | |
03/26/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*/ 1) NOT INSTALLED PER PLAN - SEE PLBG ISOMETRIC AT P-1. 2) HOT AND COLD PEX MAY NOT BE BUNDLED TOGETHER (HEAT TRANSFER). 3) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE THRU WYE BRANCH OR EQUIVELENT SWEEP. | |
03/24/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000*/ 1) GAS PRESSURE TEST OK 2) NO TEST ON DWV PIPING |