Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM03509

Parcel: 110055580

Inspection Status: Approved

Inspection History: MECHANICAL - ABOVE CEILING

Permit Number - T03CM03509

Inspection Description - MECHANICAL - ABOVE CEILING

Inspection Status - Approved

Date Description Inspector Results Comments
03/05/2004 MECHANICAL - ABOVE CEILING Approved IVRS - Inspection 0000*/ 1ST FLOOR WILL CHECK UNIT LABELING, OVERFLOW SENSORS, FUSING ON FINAL. OK FOR CEILING TILES. LEAVE OUT UNDER EACH FAN COIL. OK FOR CEILING TILES 2ND FLOOR.
03/04/2004 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection 0000*/ FINISH STRAPPING FLEX DUCT, INSTALL DIFFUSERS, RELOCATE DRAIN PANS AS NEEDED. INSPECTED CONDENSATE DRAINS. 1ST FLOOR ONLY.
03/01/2004 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection 0000* CONCEAL ALL EXPOSED EDGES OF BAT INSULATION.
02/17/2004 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection 0000*/ INSPECTED 1ST FLOOR SUPPLY AND EXHAUST . OK TO SHEET ROCK NORTH HALF OF BLDG. CONFIRMED A LETTER FROM THE ARCHITECT ALLOWING INSULATION ON PLASTIC PIPE IN THE PLENUM. ALSO CHECKED LISTING ON INSULATION AND INSPECTED PIPING. OK TO COVER WITH SHEET ROCK.
02/11/2004 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection 0000*/ 2ND FLOOR ONLY - OK FOR SHEET ROCK.