Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2004 | ENGINEERING - FINAL | Approved | ||
| 10/08/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS, AND PATCH ASPHALT PAVING ON SOUTHEAST CORNER OF PROJECT. 2. PROVIDE ROCK RIP RAP AT DRAINAGE OUTFALL ON WEST PERIMETER. |
|
| 09/02/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PROVIDE BICYCLE PARKING AS SHOWN ON PLAN. 2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS, AND PATCH ASPHALT PAVING ON SOUTHEAST CORNER OF PROJECT. 3. PROVIDE ROCK RIP RAP AT DRAINAGE OUTFALL ON WEST PERIMETER. |