Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2004 | ENGINEERING - FINAL | Approved | ||
| 08/03/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. I MET WITH THE CONTRACTOR FOR THIS SITE AND WENT OVER OPTIONS FOR CONTROLLING THE DG FROM MIGRATING OFF SITE. HE HAS AGREED TO CORRECT THE PROBLEM AND CALL IN FOR A RE-INSPECTION. |
|
| 07/06/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. FINAL DETAIL WORK BEING COMPLETED AT THIS TIME. |