Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | ENGINEERING - FINAL | Approved | APPROVED PER ERNIE DUARTE. | |
| 11/22/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T03BU03223 IS COMPLETED AND APPROVED. 2. PROVIDE A REVISED AND C.O.T. APPROVED GRADING PLAN TO SHOW ALL REVISIONS AND MODIFICATIONS. 3. CONSTRUCT THE TYPE II SIDEWALK SCUPPER AT THE SOUTHEAST CORNER OF THE PROJECT TO COT/PC STANDARD DETAIL 205. 4. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING. 5. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL, DEBRIS, AND TEMPORARY CONSTRUCTION FENCING. |