Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | ENGINEERING - FINAL | Approved | APPROVED PER ERNIE DUARTE. | |
| 11/14/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED 1. NO MORE TEMPORARY C OF O'S WILL BE GRANTED FOR THIS PROJECT UNTIL THE CITY OF TUCSON RECEIVES A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD THAT THE PROJECT WAS CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS (SEE NOTE 21 OF THE GRADING PLAN). 2. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON ENGINEERING AND ZONING DIVISIONS FOR REVIEW AND APPROVAL (SEE NOTE 8 OF THE GRADING PLAN). 3. AFTER COMPLETING ITEMS 1 & 2 ABOVE CALL FOR FINAL GRADING INSPECTION #09190 FOR PERMIT #T03BU03223. 4. PROVIDE A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD REGARDING THE RETENTION/DETENTION BASIN CONSTRUCTION, DESIGN AND OPERATION (SEE NOTE #31 OF THE GRADING PLAN). 5. STRIPE CROSSWALKS ACROSS ENTRANCE DRIVES. |
|
| 11/10/2005 | ENGINEERING - FINAL | Cancelled | CANCELED BY CONTRACTOR - NOT READY |