Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM03419

Parcel: 13342001C

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
03/16/2006 ENGINEERING - FINAL Approved APPROVED PER ERNIE DUARTE.
11/14/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED
1. NO MORE TEMPORARY C OF O'S WILL BE GRANTED FOR THIS PROJECT UNTIL THE CITY OF TUCSON RECEIVES A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD THAT THE PROJECT WAS CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS (SEE NOTE 21 OF THE GRADING PLAN).
2. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON ENGINEERING AND ZONING DIVISIONS FOR REVIEW AND APPROVAL (SEE NOTE 8 OF THE GRADING PLAN).
3. AFTER COMPLETING ITEMS 1 & 2 ABOVE CALL FOR FINAL GRADING INSPECTION #09190 FOR PERMIT #T03BU03223.
4. PROVIDE A LETTER OF CERTIFICATION FROM THE ENGINEER OF RECORD REGARDING THE RETENTION/DETENTION BASIN CONSTRUCTION, DESIGN AND OPERATION (SEE NOTE #31 OF THE GRADING PLAN).
5. STRIPE CROSSWALKS ACROSS ENTRANCE DRIVES.
11/10/2005 ENGINEERING - FINAL Cancelled CANCELED BY CONTRACTOR - NOT READY