Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2004 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 06/02/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :*/ 1) GAS TEST NOT HOLDING 1) INSTALL CONDENSATE IN A WORKMANSHIP MANNER | |
| 05/16/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NEED GAS TEST 2) DON'T DRAIN CONDENSATE ONTO PORCH SLAB 3) CHECK A/C ROOF TOP UNIT FOR LEVER 4) FROM INSP AT SOIL PIPE 9/11/03. YOU WERE ASKED ABOUT 3 TOILETS PLAN SHOWED 2, SEWER CARD SHOWER JUST 2, YOU NED TOPAY FOR ONE MORE TOILET 5) YOU HAVE ONLY 3 LAVS ON SEWER CARD, YOU INSTALLED 4 6) PUT MASTIC UNDER GAS LINE BLOCKS 7) SOIL PIPE INSP WASN'T SIGNED OFF SEE NOTE #5 8) STUCCO AND INTERMEDIATE WEREN'T ENTERED |