Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | ENGINEERING - FINAL | Approved | APPROVED PER ERNIE DUARTE. | |
| 10/21/2005 | ENGINEERING - FINAL | Cancelled | CANCELED BY CONTRACTOR, TCO APPROVED ON 10-10-05 | |
| 10/10/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PROVIDE VERTICAL CURB AT END OF SIDEWALK AT HANDICAP RAMPS TO CONTROL DRAINAGE ACROSS RAMPS. 2. COMPLETE CURBING AT PARKING AREAS WHERE NEEDED. 3. PROVIDE WATER HARVEST AREAS AND POSITIVE DRAINAGE TO SIDEWALK SCUPPERS. 4. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE RETENTION/DETENTION BASIN FUNCTIONS PROPERLY AND THE ARIZONA REGISTERED ENGINEER PROVIDES A LETTER CERTIFIYING CONSTRUCTION AND OPERABILITY. |
|
| 10/07/2005 | ENGINEERING - FINAL | Denied | 1. COMPLETE ALL SITE WORK INCLUDING OVERHEAD WORK ON COVERED PARKING. 2. PROVIDE 6" MAX WATER HAZARD AREA WITH RELEASE POINT AT THE SIDEWALK SCUPPERS. 3. COMPLETE ALL CURBS AND PAVEMENT. 4. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS INCLUDING TEMPORARY FENCING. 5. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE RETENTION/DETENTION BASIN FUNCTIONS PROPERLY AND THE ARIZONA REGISTERED ENGINEER PROVIDES A LETTER CERTIFIYING CONSTRUCTION AND OPERABILITY. |