Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | ENGINEERING - FINAL | Approved | APPROVED PER ERNIE DUARTE. | |
| 09/12/2005 | ENGINEERING - FINAL | Cancelled | INSPECTION CANCELLED DUE TO TCO APPROVAL ON 9-9-05. | |
| 09/09/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T03BU03223 IS COMPLETED AND APPROVED. 1. COMPLETE CONSTRUCTION OF THE RETENTION/DETENTION BASIN. 2. BARRICADE ALL AREAS WHERE CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT ACCESS BY TENANTS OR THE GENERAL PUBLIC. |
|
| 09/02/2005 | ENGINEERING - FINAL | Denied | 1. COMPLETE CONSTRUCTION OF RETENTION/DETENTION BASIN "D" INCLUDING INLET AND OUTLET STRUCTURES. 2. DEPRESS LANDSCAPED AREAS 6" MAX. SEE NOTE 30 OF THE GRADING PLAN GD.01 SHEET 1 OF 5. THE LACK OF DEPRESSED LANDSCAPED AREA INHIBITS THE STORMWATER DISCHARGE THROUGH THE SIDEWALK SCUPPERS. 3. PROVIDE POSITIVE STORMWATER RUN-OFF/DRAINAGE FROM THE BUILDING TO THE SIDEWALK SCUPPERS. 4. REPAIR THE BROKEN CURB NORTH OF BLDG #7. |
|
| 09/01/2005 | ENGINEERING - FINAL | Denied | SEE NOTES FOR 9/2/05 |