Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2006 | ENGINEERING - FINAL | Approved | APPROVED PER ERNIE DUARTE. | |
| 05/26/2005 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O. 1. PROVIDE ADDITIONAL SCUPPERS WHERE NEEDED AS INDICATED BY WHITE PAINT ON SIDEWALK, ALSO PROVIDE DRAINAGE SWALES TO SCUPPERS. 2. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING ADJACENT TO THIS BUILDING. KEEP THE FENCE UP TO PREVENT PEDESTRIAN TRAFFIC. 3. PROVIDE RAIN GUTTERS TO PREVENT STORMWATER DRAINAGE ONTO STAIRWAYS AND PEDESTRIAN WALKWAYS. PER C.O.T. DEVELOPMENT STANDARD No,2-08.0 |
|
| 05/24/2005 | ENGINEERING - FINAL | Denied | 1. COMPLETE ALL SITE WORK AROUND BLDG.#2 AS SHOWN ON THE PHASED PLAN. 2. FINISH GRADING AND REMOVE CONSTRUCTION FENCING AND ALL CONSTRUCTION MATERIAL AND DEBRIS. 3. PROVIDE RAIN GUTTERS TO PREVENT STORMWATER DRAINAGE ON STAIRWAYS AND PEDESTRIAN WALKWAYS. SEE C.O.T. DEVELOPMENT STANDARE NO. 2-08.0 |