Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/23/2005 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection :* |
| 03/22/2005 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection :* 1) FILL UNUSED OPENINGS IN BATH BARS. 2) FINISH # 5 & 6 OF PREVIOUS INSPECTION. |
| 03/18/2005 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* NOT READY 1) IDENTIFYING TAPE TO ENCIRCLE THE CONDUCTOR OF THE ENTIRE EXPOSED LENGHT. 2) CORRECTLY SIZE BREAKER PER 836.26 FOR #8 NW CABLE. 3) TIGHTEN LOOSE WIRE TERMINATIONS IN PANELAND AT DEVICES. 4) FAN COIL DISCONNECT MEANS IF ACCESSABLE ONLY BY PERSON WORKING ON UNIT DOES NOT NEED A LOCKOUT. 5) BOXES MORE THAN 1/4" FROM BOX TO SURFACE NEED AN APPROVED EXTENDER RING 370.20/ 314.20. 6) TIGHTEN WATER HEATER FITTING AND A DISCONNECTING MEANS IS NEEDED. 7) GROUP LIGHT FIXTURES AT CARPORT CANOPY'S . 8) MAINTAIN WORKING CLEARANCES W FRONT OF A/C DISCONNECT 110. 26. 9) TIGHTEN SEAL TITE FITTINGS AND USE APPROVED CORRECT SIZED STRAPS. |