Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2004 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/16/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) FINISH VDV CABLEING -SUPPORTING, PROTECT AT STUDS, FILL UNUSED OPENINGS |
|
| 12/15/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) SUPPORT NM CABLE WITHIN 12' OF CANS 2) CHECK CONDUCTOR/CABLE FILL ON PVC SLEEVING 3) FINISH EXHAUST FANS 4) USE APPROVED CONNECTOR WITH BOXES 5) PROTECT CABLES AT STUDS |
|
| 11/04/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) SECURE SE CABLE TO PANEL 2) SUPPORT NM CABLE WITHIN 12" OF ENTRANCE TO AC AND AT 1ST CEILING 3) PROTECT ALL CABLES FROM SHARP METAL AT TRUSSES 4) SUPPORT NM CABLE WITHIN 12" OF BOXES AND FITTINGS 5) BLDG INSPECTOR TO CHECK BACK TO BACK FIRE SEPERATIONS 6) BOND RISER PER 250.94 AND 250.66 7) OK 1ST CEILING 1ST FLOOR ONLY |
|
| 10/18/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) AS NOTED COURTESY INSPECTION (BOX LAYOUT OK) |