Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/08/2003 |
ELECTRIC - ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 09/05/2003 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000* ALL DISCONNECTS, UNLESS PERMITED BY THE MANUFACTURER, MUST BE MOUNTED IN THE VERTICAL POSTION. |
| 09/03/2003 |
ELECTRIC - ABOVE CEILING |
|
Denied |
IVRS - Inspection 0236*/ 1) CABLES MAY NOT BE BUNDLED. THE M.C. CABLE MUST BE UN BUNDLED, SPREAD OUT, AND SUPPORTED EVERY 6 FEET. DO NOT GROUP MORE THAN THREE (3) OR FOUR (4) CABLES. DO NOT USE PLSTIC TIE-RAPS TO SUPPORT CABLES. THE SEISMIC WIRES SHOULD BE SET STRAIGHT NOT AT DIAGONAL ANGLES. THEY SHOULD NOT SWING OR TWIST IF DISLODGED FROM CEILING GRID |
| 08/18/2003 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection 0000* |