Permit: T03CM03297

Inspection Status: Approved

Inspection History: PLUMBING - SEWER HCS CONNECT

Permit Number - T03CM03297

Inspection Description - PLUMBING - SEWER HCS CONNECT

Inspection Status - Approved

Date Description Inspector Results Comments
07/23/2003 PLUMBING - SEWER HCS CONNECT Approved IVRS - Inspection 0000*/ 1) CORRECTIONS MADE OK. PLUMBERS LICENSE OK. 2) OK TO BACKFILL SEWER.
07/18/2003 PLUMBING - SEWER HCS CONNECT Denied IVRS - Inspection 0999*/ 1) MINIMUM REQUIRED CLEAN-OUT SIZE FOR 4" IS 3 1/2" NOT 3". PLEASE PROVIDE NAME AND LICENSE NUMBER OF PLUMBING CONTRACTOR AT TIME OF NEXT INSPECTION
07/17/2003 PLUMBING - SEWER HCS CONNECT Not ready for Inspection 1) NOT READY FOR INSPECTION. 2) REVISED SEWER PLAN ON SITE.
07/16/2003 PLUMBING - SEWER HCS CONNECT Not ready for Inspection IVRS - Inspection 0000*/ NOT READY ON SITE SEWER. PLEASE PROVIDE APPROVED REVISED DRAWINGS. PLEASE PROVIDE PROPER SIZE CO FOR 4". PROVIDE TEST.
07/15/2003 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection 0000*/SITE SEWER PARTIAL APPROVED. PLEASE PROVIDE APPROVED REVISED PLAN FOR LOCATION. OK TO COVER UP TO 4" TWO WAY CO-WILL NEED TO UNCOVER FROM TWO WAY TO POINT OF CONNECTION WILL REQUIRE JOINT SEWER USE AGREEMENT AT TIME OF NEXT INSP.