Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 10/14/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0935*/ 1) TRAP WEIR HIGHER THAN VENT OPENING HALL LAV 2) REVERSE PITCH MASTER BATH LAV ARM 3) NAIL PROTECT PLUMBING AND WIRES WITHIN 1 1/4" OF WALL SURFACE 4) DOUBLE TOP PLATE OVER NOTCHED-INSTALL 2 FHA STRAPS |
| 10/13/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ 1) REVISE PITCH ON LAUNDRY VENT 2) LEAK AT LAV TRAP ARM 2 EACH 3) RED HEAD ANCHOR BOLTS LOOSE 3) STOPPED INSPECTION |
| 10/09/2003 |
FRAMING |
|
Denied |
IVRS - Inspection 0950*/ 1) HOUSE NOT READY 2) LAV TRAP ARMS CANNOT EXCEED 1 1/2" SEE UPC 1003.3 2) TRAP ON LAVS HIGHER THAN VENT OPENING 3) BACK GROUT TUB FLOOR PENETRATING 4) PLUMBING AND FRAME TRADES NOT COMPLETE |