Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/06/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) NEED POSTS BETWEEN GUEST HOUSE AND MAIN HOUSE |
|
| 03/31/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) INTERIORS OF ALL BLDGS APPROVED 2) NEED DWV TEST AND SUPPLY LINE TESTS IN OUT BUILDINGS PRIOR TO INSULATION 3) RECHECK GAS LINE WITH GUAGE IN GARAGE |
|
| 03/02/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) HOUSE OK INSIDE 2) NEED DBL 2 X 6 POSTS ON PORCH BEAMS PER 53.0 3) S/D IN EXERCISE ROOM NOT WIRED 4) LOWER S/D IN HALL TO MASTER SUITE TO BETWEEN 6 AND 12" OF CEILING 5) HOUSE OK |
|
| 02/28/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) FRAMING PENDING COMPLETION OF INTERMEDIATES 2) WIRES BY GARAGE DOORS NEED TO BE PROTECTED OR WALL FURRED OUT 3) PURPOSE OF WIRE IN CEILING OF GARAGE STORE ROOM ? 4) SMOKE DETECTORS TO BE BETWEEN 6 AND 12" OF CEILING 5) RECPTACLE FOR REFRIGERATOR ? 6) UNWIRED BOXES IN KITCHEN ? 7) DWV APPROVED 8) PEX APPROVED MAIN HOUSE |