Inspection History Details
Permit: T03CM03109
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2003 | ENGINEERING - FINAL | Approved | ||
| 11/12/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PROVIDE BICYCLE PARKING AS SHOWN ON THE SITE PLAN OR GET APPROVAL FROM ENGINEERING AND ZONING DIVISION (CRAIG GROSS) FOR BICYCLE PARKING REVISIONS. |
|
| 11/05/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PROVIDE BICYCLE PARKING AS SHOWN ON THE SITE PLAN OR PROVIDE A REVISED SITE PLAN THAT HAS BEEN STAMPED AND APPROVED BY C.O.T. ZONING AND ENGINEERING DIVISIONS. |
|
| 10/29/2003 | ENGINEERING - FINAL | Denied | SITE IS NOT READY FOR INSPECTION. COMPLETE SIDEWALKS AND BICYCLE PARKING. |