Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T03CM03014
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/18/2004 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
01/02/2004 | BUILDING - FINAL | Denied | IVRS - Inspection 0999*/ 1) INSTALL CLEANOUT CAP KITCHEN DRAIN, EXTERIOR WALL 2) INSTALL MINIMUM 2 10" X 12" DUCTS GAS FURNACE ROOM COMBUSTION/RELIEF VENTS-1 WITHIN 12" OF CEILING; 1 WITHIN 12" OF FLOOR 3) COMPLETE DIRT GRADING TO SLOPE AWAY FROM HOUSE 4) INSTALL VENT FREEZE BOARDS PER PLAN 5) ELECTRIC WATER HEATER ROMEX TO BE IN FLEXIBLE CONDUIT 6) NEED INSULATION CERTIFICATE (WALLS AND CEILING) 7) INSTALL GABLE END VENT | |
07/25/2003 | BUILDING - FINAL | Denied | IVRS - Inspection 0999*/ 1) POST ADDRESS NUMBERS ON HOUSE VISIBLE FROM 6TH AVE. 2) KITCHEN ELECTRIC 2 HAVE 2-20 AMP SMALL APPLIANCE CIRCUIT 3) INSTALL ELECTRIC FIXTURES 4) OUTLET MISSING KITCHEN WALLS PER PLAN 5) NEED INSULATION CERTIFICATE 6) WATER HEATER ELECTRIC TO BE IN FLEX, CONDUIT 7) FURNACE GAS FLEX CANNOT GO THROUGH CABINET 8) ELECTRIC FURNACE TO HAVE ROMEX CONNECTOR AT CABINET PENETRATION 9) FURNACE COMBUSTIBLE AIR NOT TO CODE 10) REPLACE SWITCH PLATE BATHROOM 11) INSTAL ANTI-SIPHON HOSE BIBS 12) SEAL ALL PENECTRATIONS EXTERIOR WALLS 13) INSTALL CAP EXTERIOR FURNACE FLUE PIPE 14) CUT SEWER CLEANOUT TO GRADE 15) COMPLETE GRADING TO SLOPE AWAY FROM HOUSE 16) INSTALL GABLE END VENTS PER PLAN 17) INSTALL VENTED FREEZE BOARDS PER PLAN 18) NEED TO ADD ELECTRIC, PLUMBING, MECHANICAL AND GAS TO RENEWED PERMIT CARD |