Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/21/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Approved |
IVRS - Inspection 0000* |
| 07/18/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Denied |
IVRS - Inspection 0999*/ 1) EVEN THOUGH THIS IS FOR TEMPORARY USE WHILE UNDER CONSTRUCTION YOU WILL NEED TO A) SECURE GAS PIPING AT WATER HEATER LOCATION B) INSTALL AND EXTEND WATER HEATER FLUE PIPE ABOVE ROOF LINE C) REMOVE "T" FITTING FROM LINE AT HOUSE 2) MINIMUM 10 POUND PRESSURE TEST REQUIRED 3) ALSO EXTEND PTR LINE WATER HEATER TO WITHIN 6" OF GROUND |