Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T03CM02962
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2003 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000*/ 1) WASTE AND VENT SYSTEM. 2) OVERHEAD WATER DISTRIBUTION IS OK. 3) GAS PRESSURE TEST IS OK. | |
10/06/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*/1) MUST RUN 1-1/2" TRAP ARM ALL THE WAY TO BARREL OF 3" STACK. 2) MUST SEPARATE HOT AND COLD WITH INSULATION. 3) MUST REMOVE ALL THREAD PROTECTORS IN GAS LINE. 4) RE-TEST SYSTEMS. | |
09/29/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*/1)MUST PROVIDE WATER TEST ON WASTE AND VENT SYSTEM ALL THE WAY TO TOP OF VENTS THRU ROOF 2) I DO NOT ACCEPT COPPER BACKING WITH TIE WIRE FOR TUB DIVERTERS. 3) CAN NOT HAVE A 2" TRAP ARM FOR LAVATORYS. THIS TRAP ARM MAX SIZE IS 1-1/2". 4) MUST PROVIDE L-SWEEPS FOR HORIZONTAL VENTS BELOW 6" OF FLOOD RIM LEVEL. 5) MUST STRAP DOWN GAS LINE EVERY 6'. 6) MUST REMOVE THREAD PROTECTOR AND PROVIDE APPROVED COUPLING IN GAS LINE. |