Permit: T03CM02958

Parcel: 130056720


Addresses:

2425 S EDMONDSON AV


Inspection Status: Approved

Inspection History: FRAMING

Permit Number - T03CM02958

Inspection Description - FRAMING

Inspection Status - Approved

Date Description Inspector Results Comments
10/22/2004 FRAMING Approved
06/25/2004 FRAMING Partial Approval 1) WILL APPROVE FRAMING INSPECTION WHEN 1" CLEARANCE IS PROVIDED BY FINALS 2) WILL NEED TO VIERIFY UFER
04/07/2004 FRAMING Partial Approval IVRS - Inspection 0000*/ 1) 10 POUND GAS PRESSURE TEST REQUIRED ALL NEW PIPING 2) STRAP ALL PLUMBING PENETRATIONS THROUGH FRAMING ( DRYWALL NAILS MAY PENETRATE ) 3) MAINTAIN 1" CLEARANCE AROUND WATER FLUE PIPE TO COMBUSTIBLES AT ROOF 4) MINIMUM 12 COVER OVER ABS PIPING OR 2" CONCRETE AFTER BACKFILL OF DIRT OVER PIPING 5) 3" CLEARANCE BELOW BOTTOM OF WATER HEATER PTR LINE TERMINATION PIPING AND CONCRETE 6) COMPLETE ALL AND RECALL
03/19/2004 FRAMING Denied IVRS - Inspection 0999*/' 1) INSTALL BOX EXTERIOR FOR LIGHTS 2) MAKE ELECTRIC JUNCTION BOXES ACCESSIBLE 3) SEAL AROUND PIPING PENETRATION MASONRY WALLS 4) WATER HEATER TPR LINE TO TERMINATE OUTSIDE OF CABINET 5) INSTALL ROOF JACK WATER HEATER FLUE ON ROOF 6) 1" CLEARANCE WATER HEATER FLUE TO COMBUSTIBLES 7) REMOVE DUCT TAPE AT FLUE PIPE ABOVE WATER HEATER AND SCREW TOGETHER 8) UNCOVER ALL PIPING OUTSIDE ADDITION-WATER TEST SAME THRU ROOF 9) 10 POUND GAS PRESSURE TEST REQUIRED ALL NEW PIPING 10) GAS PIPING SIZE APPEARS TO BE TOO SMALL 11) SUBMIT CALCULATIONS TO CITY PLAN CHECK FOR APPROVAL 12) STOPPED INSPECTION COMPLETE ALL ITEMS LISTED ON 3/4/04 AND 3/19/04
03/04/2004 FRAMING Denied IVRS - Inspection 0999*/ 1) LABEL ADDRESS ON MAIN ELECTRIC PANEL 2) INSTALLED SWITCH AND LIGHT WATER HEATER AREA AND OUTSIDE EXCEPTABLES 3) BUNDLE ELECTRIC WIRES AT ELECTRIC PANEL 4) INSTALL ADDITIONAL STUDS FOR DRYWALL NAILERS 5) 12-2 WIRE STUBBED UNDER WINDOW NOT ON PLAN 6) COLOR CODE NEUTRAL WIRE OUT OF ELECTRICAL RISER ROOF 7) DOOR TO BATH NOT ON PLANS 8) INSTALL FLUE PIPE, T & P LINE AND ENCLOSURE WATER HEATER 9) CLOTHES WASHER PLUMBING NOT TO CODE 10) INSTALL POSITIVE CONNECTION AT ALL BEARING POINTS (FRAMING) 11) UNCOVER SEWER LINE AT EDGE OF HOUSE TO CONNECTION (INSTALL 2 WAY CLEANOUTS) 12) MUST HAVE WATER TEDST ON DWV SYSTEM 13) MECHANICAL DUCTING NOT PER PLAN 14) INSTALL NAIL PROTECTION ALL PLUMBING AND ELECTTRIC PENETRATIONS THROUGH WOOD 15) INSTALL WATER TEST ON SEWER LINE 16) STOPPED INSPECTION, COMPLETE ALL AND RECALL