Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/15/2003 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK. 2) OVERHEAD WATER DISTRIBUTION IS OK. 3) OK FOR DRYWALL. 4) NOTE: CLOSET RINGS ARE INSTALLED. |
| 08/12/2003 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 07/28/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ AIR PRESSURE TEST 60' FOR UNDERSLAB WATER DISTRIBUTION IS OK. |
| 07/18/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) SOIL WATER TEST FOR SAN WASTE AND GREASE LINE IS OK 2) P.O.C. OF NEW BLDG DRAIN TO EXISTING BLDG DRAIN IS OK 3) OK TO BACKFILL TRENCH 4) NOTE: WILL REQUIRE PLBG. CONTRACTOR TO RED LINE AS BUILTS PRIOR TO BACKFILL |
| 07/15/2003 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1) SOIL WATER TEST IS OK. 2) P.O.C. OF NEW BLDG. DRAIN TO EXISTING DRAIN IS OK. 3) THIS INSPECTION IS FOR 2" WASTE FOR FLOOR SINK @ WORTH WEST SIDE OF UNIT SPACE. 4) OK TO BACKFILL TRENCH. |